Conrail Point-No-Point Project is 60% complete with both sides of the Bascule span completed with 1 major bridge to be completed over PATH. The original swing bridge was built between 1889 -1901 by New York Bay Railroad and was operated by steam power from coal. The structure features five deck-plate girder approach spans and one camelback Howe through-truss swing span on a center bearing. The NYBRR was conceived and constructed as part of the PRR’s wider terminal improvements program in conjunction with the company’s entry into the Port of New York, the nation’s undisputed commercial hub at the turn of the twentieth century.

The project is being replaced by a bascule span on a new alignment in a very congestion area between NJTA, PATH and CSX Intermodal yard on a limited ROW.

Over 20 freight trains used this corridor critical to the Newark Ports. This is the largest under taken by Conrail Shared Assets.

All individuals attending must bring PPE (Safety Boots, Hard Hat, Safety Vest, Eye protection). A job briefing will be held promptly starting at start of the tour. Individuals not having the correct PPE will not be able to attend the tour and will be required to immediately leave the jobsite.

You must register for this event. No walk-ins permitted. Site tour is limited to the first 30 people to register.

Presentation will be from 12pm to 1pm.

Anyone going on the site tour will meet at 2pm. Location to be provided upon registration.

2 PDH pending for Presentation & Site Visit

1 PDH pending for Presentation Only

Earlier Event: June 15
CTG - IN PERSON
Later Event: September 7
ASCE NJB - Softball Tournament